Ontario Fences — RFI Response
Ontario Fences Fencing & Perimeter Construction · London, Ontario
Document No. OF-2026-RFI-041
Revision 0  ·  Issued for Review
Response to Request for Information
Supply & Installation of
Pressure-Treated Wood
Privacy Fencing
Prepared in response to [RFI No. XXX-2026] issued by [Contracting Authority / Department], including company qualifications, installation methodology, technical specifications, and a detailed schedule of pricing.
Submitted To
[Agency Name]
Procurement Services
[Address]
Submitted By
Ontario Fences
London, Ontario
ontariofences.ca
Date of Issue
July 10, 2026
Valid 60 days
from issue
TYP. BAY 2 440 mm
Letter of Transmittal

Re: [RFI No. XXX-2026] — Wood Privacy Fencing

July 10, 2026

[Contact Name], Procurement Services
[Agency Name] · [Address Line]

Dear [Contact Name],

Ontario Fences is pleased to submit this response to the above-referenced Request for Information. This document sets out our corporate qualifications, our understanding of the project requirements, our complete installation methodology — including foundation, framing, and fastening specifications with stated construction tolerances — a full schedule of materials, and a detailed schedule of pricing for the supply and installation of pressure-treated wood privacy fencing.

All work described herein is performed by our own crews, is fully insured and WSIB-covered, and is warranted in accordance with Section 9 of this document. We confirm our availability to mobilize within ten (10) business days of award and to meet the completion milestones identified by the Contracting Authority.

We welcome the opportunity to discuss any aspect of this submission and to attend a site review at your convenience.

Respectfully submitted,

Ontario Fences
London, Ontario · ontariofences.ca · [Phone] · [Email]

Contents
1.0Company Profile — Who We Are03
2.0Project Understanding & Rationale04
3.0Installation Methodology05
4.0Technical Specification — Post Foundation Detail06
5.0Fastening Specification & Construction Tolerances07
6.0Schedule of Materials08
7.0Completed Installation — Design Rendering09
8.0Schedule of Pricing10
9.0Schedule, Warranty & Conditions11
10.0Acceptance & Execution12
Section 1.0 · Company Profile

Who We Are

Ontario Fences is a London, Ontario fencing and perimeter construction company specializing in residential, commercial, and institutional wood, chain-link, and ornamental fencing across Southwestern Ontario.

Every installation is performed by our own trained crews — we do not broker work to third-party subcontractors. This gives the Contracting Authority a single point of accountability from site layout through final deficiency review, and it is the reason our installations consistently pass inspection on first review.

Our institutional and municipal work is built to documented specifications: engineered post embedment below local frost depth, hot-dipped galvanized fastening throughout, and written construction tolerances that are measured and recorded during our quality-assurance walkthrough (Section 5).

15+ yrs
Combined crew experience, wood fencing
$5M
Commercial general liability coverage
100%
WSIB coverage — clearance on request
5 yr
Written workmanship warranty
Compliance & Documentation Certificates of insurance, WSIB clearance certificates, WHMIS/working-at-heights training records, and references from comparable installations are available upon request and will be furnished with any subsequent formal bid submission. Ontario Fences carries out utility locates through Ontario One Call prior to any excavation, per Ontario Underground Infrastructure Notification System Act requirements.

Service capability. Pressure-treated pine and cedar privacy fencing; board-on-board and good-neighbour profiles; gates and hardware; chain-link and ornamental steel; post replacement and remediation; snow-load and wind-exposure detailing for open-site installations.

Section 2.0 · Project Understanding

Why We Are Undertaking This Work

The Contracting Authority requires a durable, uniform, low-maintenance perimeter enclosure that provides privacy screening and controlled separation of the subject property, installed to a documented standard suitable for public-sector asset management.

Our understanding of the requirement. Based on the RFI documents, the work comprises the supply and installation of approximately 150 linear metres of 1 830 mm (6 ft) pressure-treated wood privacy fencing, including two pedestrian access gates, removal and lawful disposal of any existing fencing, and full restoration of disturbed ground. Final quantities are to be confirmed by joint site measurement prior to contract execution.

Why this profile. We are proposing a three-rail, vertical-board privacy profile on 4×4 pressure-treated posts because it is the most serviceable configuration for a public installation: individual boards are replaceable without disassembly of the panel, the third rail eliminates mid-span board cupping on 1 830 mm heights, and all structural members are ground-contact-rated (UC4A) treated lumber.

Why Ontario Fences. This project sits squarely within our core scope. We install this exact assembly year-round in London-area soil conditions, our foundation detail (Section 4) is designed for the local 1.2 m frost penetration depth, and our crews measure and record the construction tolerances stated in Section 5 on every job — not only when an inspector is present.

Objectives of this submission 1  Demonstrate a documented, inspectable installation methodology.  ·   2  State measurable tolerances the work will be built and verified to.  ·   3  Provide transparent unit pricing that can be scaled to final measured quantities.
ParameterProposed Basis of Design
Fence typeVertical-board privacy, three-rail, pressure-treated SPF pine
Nominal height1 830 mm (6′-0″) above finished grade
Run length (approx.)150 lin. m — to be confirmed by joint measurement
Bay spacing2 440 mm (8′-0″) post centres, typ.
Gates2 × 1 220 mm pedestrian gates, self-closing hardware
Governing referencesOBC 2024 frost-depth provisions; CSA O80 series (treated wood); ASTM A153 (galvanizing); Ontario One Call locates
Section 3.0 · Methodology

How the Work Is Performed

A six-phase sequence, executed by a single dedicated crew, with hold points for utility locates and post-set cure before framing loads are applied.

01

Site Layout & Utility Locates

Property line confirmed against survey pins with the Contracting Authority’s representative. String line established; post centres marked at 2 440 mm typ. Ontario One Call locates completed and paint/flags preserved for the duration of excavation. Hold point: no digging until all clearances are received.

02

Excavation

Post holes augered to Ø 250 mm × 1 219 mm depth below finished grade — below the 1.2 m London-area design frost line. Hole bottoms cleaned of loose spoil; depth verified with a graded rod at every hole before setting.

03

Post Setting & Concrete

150 mm of ¾” clear gravel placed and compacted at each hole base for drainage. 4×4 UC4A posts plumbed in two axes and braced; holes filled with 30 MPa ready-mix concrete, rodded to eliminate voids, and crowned 50 mm above grade, sloped away from the post to shed water. Hold point: minimum 24 h cure before rail loads.

04

Framing — Rails

Three 2×4 rails per bay (top, mid, bottom) fixed to posts with hot-dipped galvanized structural screws, two per connection. Bottom rail held 50 mm ± 10 mm above grade to prevent ground contact of horizontal members.

05

Cladding — Boards

1×6 fence boards installed vertically to a string-lined top edge, gapped 6 mm ± 2 mm for drying movement, and fastened with two ring-shank galvanized nails per rail crossing to the penetration and seating tolerances specified in Section 5.

06

Quality Assurance & Restoration

Full-run walkthrough measuring plumb, alignment, and height against Section 5 tolerances; results recorded on our QA sheet and provided to the Contracting Authority. Spoil removed, disturbed ground topped with screened soil and seeded, and site left broom-clean.

Section 4.0 · Technical Specification

Post Foundation Detail — Cross Section

FINISHED GRADE DESIGN FROST LINE — 1 200 mm 1 219 mm EMBEDMENT ±25 mm 150 mm GRAVEL 50 mm CROWN Ø 250 mm 1 830 mm A.F.G. (N.T.S.) 4×4 (89×89 mm) UC4A post, pressure-treated, ground-contact rated 30 MPa concrete, rodded, crowned to shed water ¾” clear gravel, compacted, free-draining base 2×4 rails, 3 per bay
Figure 4.1 — Typical post foundation, section view · Below-grade portion to scale (1 mm : 0.30 px) · Above-grade height not to scale
Section 5.0 · Fastening & Tolerances

Fastening Specification & Construction Tolerances

44 mm ±10 mm NAIL PENETRATION INTO RAIL 19 mm 38 mm RAIL HEAD FLUSH 0 / −1 mm 1×6 BOARD
Figure 5.1 — Board-to-rail fastening detail, plan section

Fasteners. Boards are fixed with 63 mm (2½”) hot-dipped galvanized ring-shank nails (ASTM A153), two per rail crossing, six per board. Driven depth is controlled so that penetration into the rail is 44 mm ± 10 mm, with heads seated flush to a maximum of 1 mm below the board face — never proud, and never over-driven through the fibre.

Structural connections. Rails are fixed to posts with #10 × 75 mm hot-dipped galvanized structural screws, two per connection. Gate hardware is through-bolted with galvanized carriage bolts and lock nuts.

Verification. Fastening is checked at the Phase 06 QA walkthrough on a sampling basis of one bay in ten, and any nail outside tolerance is pulled and re-driven — boards damaged in correction are replaced at our cost.

Table 5.2 · Construction Tolerances
ItemSpecified ValueTolerance
Nail penetration into rail44 mm± 10 mm
Nail head seating (below board face)0 mm+0 / −1 mm
Post embedment depth1 219 mm± 25 mm
Post plumb (both axes)true vertical± 5 mm per 1 000 mm
Post spacing, centre-to-centre2 440 mm± 10 mm
Fence height above finished grade1 830 mm± 15 mm
Board-to-board gap6 mm± 2 mm
Bottom rail clearance above grade50 mm± 10 mm
Top line straightness (string-line deviation)0 mm± 10 mm over any 10 m
Section 6.0 · Materials

Schedule of Materials

Quantities are based on 150 linear metres at 2 440 mm bay spacing — 61 full bays, 62 posts, two gate openings — and include a 5% cutting and cull allowance on boards.

No.ItemSpecificationUnitQty
6.1Fence posts4×4 (89×89 mm) PT SPF, UC4A, 2 740 mmea62
6.2Gate posts6×6 (140×140 mm) PT SPF, UC4Aea4
6.3Rails2×4 (38×89 mm) PT SPF, UC3B — 3 per bayea183
6.4Fence boards1×6 (19×140 mm) PT, 1 830 mm — 16/bay + 5%ea1 025
6.5Fence panels (assembled bays)Site-built, 2 440 × 1 830 mm typ.bay61
6.6Pedestrian gates1 220 mm, welded-frame kit, self-closingea2
6.7Post capsPyramid, treated, fixed w/ galv. bradsea66
6.8Ring-shank nails63 mm HDG (ASTM A153) — 6 per boardea6 150
6.9Structural screws#10 × 75 mm HDG — 2 per rail endea732
6.10Concrete30 MPa ready-mix / high-strength bagged3.9
6.11Clear gravel¾” clean crushed, 150 mm base per holet1.2
6.12RestorationScreened topsoil & seed, disturbed areaslot1
Material certifications All treated lumber is supplied with CSA O80-series treatment certification and end-tags retained for the project record. Fastener galvanizing certificates (ASTM A153) and concrete supplier batch tickets are compiled into the close-out package delivered at substantial completion.

Substitutions. No material substitutions are made without written approval of the Contracting Authority. Where supply conditions require an equivalent, the proposed equivalent will meet or exceed the specification above and will be documented on a substitution request form prior to installation.

Section 7.0 · Completed Installation

Design Rendering — Finished Condition

Architectural elevation rendering of the completed installation: 1 830 mm three-rail privacy fence with pyramid post caps and pedestrian gate, shown at typical grade.

1 830 mm A.F.G.
Figure 7.1 — Elevation rendering, typical run with pedestrian gate · Illustrative only; final grading and planting per site conditions

The finished installation presents a continuous, string-lined top edge; uniform 6 mm board gapping; concrete collars dressed below turf level; and hardware in a consistent hot-dipped-galvanized finish. Photographic references of comparable completed installations are available on request.

Section 8.0 · Pricing

Schedule of Pricing

Unit-rate pricing based on 150 linear metres; the contract value scales to final quantities confirmed by joint site measurement. All amounts in Canadian dollars.

No.DescriptionUnitQtyUnit RateExtended
8.1Mobilization, layout & utility locateslot1$1,850.00$1,850.00
8.2Removal & disposal of existing fencing (allowance)lin. m150$9.50$1,425.00
8.3Supply & install 1 830 mm PT privacy fence, three-rail, per Sections 4–6lin. m150$118.00$17,700.00
8.4Supply & install pedestrian gate, 1 220 mm, self-closing hardwareea2$695.00$1,390.00
8.5Site restoration — topsoil, seed, broom-cleanlot1$1,150.00$1,150.00
Subtotal$23,515.00
HST (13%)$3,056.95
Total Contract Price$26,571.95

Pricing basis. Rates are firm for sixty (60) days from the date of issue and include all labour, materials, equipment, supervision, disposal fees, and applicable permits within our scope. HST is shown separately. HST No. [XXXXX XXXX RT0001].

Payment terms. Net 30 from progress invoice. Public-sector holdback per the Construction Act, R.S.O. 1990, c. C.30 (10%, released following publication of certificate of substantial performance), if applicable to the resulting contract form.

Included. Utility locates; excavation and spoil removal; 30 MPa concrete footings; all fastening hardware per Section 5; QA documentation package; restoration of disturbed ground.

Excluded. Rock excavation or obstructions requiring mechanical breaking (unit-priced if encountered); survey by an O.L.S.; relocation of buried services; landscaping beyond restoration of the fence line.

Section 9.0 · Schedule, Warranty & Conditions

Schedule, Warranty & Conditions

9.1 · Project Schedule
Ref.MilestoneDuration / Timing
M1Award & contract executionDay 0
M2Mobilization, layout, utility locatesWithin 10 business days of award
M3Excavation & post setting completeM2 + 4 working days
M4Framing & cladding completeM3 + 6 working days
M5QA walkthrough, restoration, demobilizationM4 + 2 working days
M6Substantial completion & close-out packageApprox. 12 working days on site, weather permitting
9.2 · Warranty

Ontario Fences warrants all workmanship for a period of five (5) years from substantial completion, including post plumb and stability, rail connections, and board fastening. Materials carry the manufacturer’s or treater’s warranty (typically limited lifetime against structural failure from rot and fungal decay for UC4A-rated lumber). Warranty service calls are attended within ten (10) business days of written notice. The warranty excludes damage from vehicle impact, vandalism, alteration by others, and acts of nature beyond design loading.

9.3 · General Conditions

Health & safety. Work is performed under the Occupational Health and Safety Act (Ontario) and our written safety policy; site-specific hazard assessment is completed at mobilization. Insurance. $5M CGL naming the Contracting Authority as additional insured upon request; WSIB clearance furnished before mobilization. Site conduct. Crews are uniformed and identified; work hours conform to local noise by-laws; the site is left secure and tidy at the end of each working day.

Changes. Any change to scope, quantities, or specification is priced and approved in writing before the affected work proceeds. Weather. Concrete is not placed below −5 °C without cold-weather protection measures; schedule relief applies for days lost to weather unsuitable for the current phase.

Status of this document This document is a response to a Request for Information and, together with its pricing schedule, constitutes an offer capable of acceptance. Upon execution of Section 10 by both parties, it forms a binding agreement for the work described herein, subject to any superseding contract form issued by the Contracting Authority.
Section 10.0 · Acceptance

Acceptance & Execution

Executed in duplicate. Each party warrants that its signatory is authorized to bind it to the terms of this agreement.

The undersigned parties agree to the scope of work, specifications, tolerances, schedule of materials, pricing, and conditions set out in Sections 1.0 through 9.0 of document OF-2026-RFI-041, Revision 0, dated July 10, 2026, for the supply and installation of pressure-treated wood privacy fencing at [Project Address].

The Contractor

Ontario Fences

London, Ontario

Signature
Name & Title (print)
Date
The Contracting Authority

[Agency Name]

[Address]

Signature
Name & Title (print)
Date
Contact for this submission Ontario Fences · London, Ontario · [Phone] · [Email] · ontariofences.ca
Please reference document no. OF-2026-RFI-041 in all correspondence.